Project Description
Hirsch & Associates, Inc. worked with Hellas Construction on this Design/Build project for the school. The project included removal of an existing field and design of new grading and drainage infrastructure. The new field design includes both Football, Track & Field events and Soccer striping. Infill is an organic mix of coconut fiber and cork, reducing field temperature compared to rubber infill. The project includes a field irrigation cooling system and wash down.